We ran into some construction delays this past week so will be excavating out the gravel at the loading dock early this week instead. Everything from last weeks post remains the same for this week.
The ADA lift is scheduled to be repaired Monday, June 3 mid-afternoon.
We are continuing to do everything we can to get the freight elevator back in service, but engineering and material availability have caused delays. We will keep everyone posted. If you need to move materials with the freight elevator please reach out to us directly so we can coordinate with you.